Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Beijing Yuanhua Century Building Materials Co

High-strength non-shrinkage grout, orifice pressurizer, orifice pressurizer, ...

sell
  • There is no classification
contact
  • Contact:颜飞
  • Phone:029-89246820
search
 
link
  • There is no link yet
home > sell > Yueqing City Equipment Secondary Grouting Material H40 Grouting Material Price Yuanhua Century
Yueqing City Equipment Secondary Grouting Material H40 Grouting Material Price Yuanhua Century
products: Views:5Yueqing City Equipment Secondary Grouting Material H40 Grouting Material Price Yuanhua Century 
brand: 北京远华世纪建材有限公司
price: 850.00元/吨
MOQ: 1 吨
Total supply: 100000 吨
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: 2016-07-09 [Expired]
Last updated: 2015-07-10 15:35
Details
Manufacturer’s consultation hotline:

Product features of grouting material
.br>Early strength and high strength: resistance to daily pressure can reach above
.br>High self-flowing property: can fill all gaps , to meet the secondary grouting requirements of the equipment.
.br>Micro expansion: ensure close contact between the equipment and the foundation, and no shrinkage after secondary grouting. The bonding strength is high, and the holding force with steel bars is not less than that.
.br>Can be constructed in winter: outdoor construction is allowed at temperatures of ℃.
.br>Strong durability: This product is an inorganic cementing material, and its service life is greater than the service life of the base concrete. After hundreds of fatigue tests, there is no significant change in the strength of the freeze-thaw cycle test. The strength is significantly improved after soaking in engine oil.
Product Usage
.br>Suitable for basic grouting of machine bases, anchor bolts and other equipment.
.br>Reinforcement, repair and reinforcement of building beams, slabs, columns, foundations, floors and roads.
.br>Can be used for anchoring anchor bolts and steel bars and structural reinforcement.
.br>Embedding and fixing construction joints of subway, tunnel, underground and other projects using reverse driving method.
.br>As well as secondary grouting for fixed connections between steel structures (rails, steel frames, steel columns, etc.) and foundations.
Reference usage
The reference usage calculation is based on tons and cubic meters to calculate the actual usage.
Technical indicators
< r
< :~~~_.:__ > br>Item

Model
< Compressive strength ()
< r Vertical expansion rate

(%)
< r Fluidity ()
< r Slump

()
< Rebar bond strength ()




Round steel
Rebar

General purpose Type (type)



.





Reinforced type (type)



.





Ultra-fine type (type)



.















Emergency repair type (type)



.






Note: Compressive strength according to: "B Cement Mortar Strength Test Method"
Expansion According to: "Technical Specifications for Application of B Concrete Admixtures".
When the thickness of the grouting layer is used, select or
When the thickness of the grouting layer is used, select or
When the thickness of the grouting layer is used, select orbr>
For rapid road repair, select the type.
Construction steps
.br>Prepare mixing equipment, grouting equipment, formwork and maintenance items, clean the grouting space and wet the concrete surface in advance.
.br>Support the formwork and seal the joints of the formwork with cement (sand) slurry and plastic tape to ensure no water or slurry leakage.
.br>Add water according to the weight of the grouting material and stir (mechanical stirring for 1 minute, manual stirring for more than 10 minutes)
.br>Pour the evenly stirred grouting material into the grouting part from one direction. If necessary, bamboo strips or steel drills can be used to guide the flow, and the template can be properly vibrated or lightly tapped.
.br>After the construction is completed, it should be covered immediately with plastic film and covered with straw curtains or quilts for a moist and humid curing day.
.br>The operating temperature is ℃ to ℃. It is strictly prohibited to mix any additives or external additives into the grouting material.
The relationship between film removal, curing time and environment
< >

Daily minimum temperature (℃)
< > Film removal time ()
< > Maintenance time ()

< > < r>~
< > < r>
< > < r>

< > < r>~
< > < r>
< > < r>

< > < r>~
< > < r>
< > < r>

< > < r>
< > < r>
< > < r>


Packaging, storage and transportation
. The grouting material is packed in bags and stored in a ventilated and dry place away from direct sunlight
. The shelf life is one month. If it exceeds the shelf life, it must be re-inspected before it can be used
A total of0articles  Related Comments: